Skip to main content
Jacket Installation for Converter Station DolWin Gamma
- Installation of jacket and foundation with piles and grouting.
Fender Installation for Barge positioning
- Installation of 6 fenders to prevent damages by barge on the jacket during topside installation.
Pile Cutting
- Cut the outer piles as decided from BSH (-12m LAT) to prevent hull damages for ships in distress.
Commissioning Inspection for Certification
- Check the installed systems for working as requested by risk matrix or predefined function.