Mergel Dredging for Cable 261 Arkona Becken
- Mergel dredging to prepare the seabed for cable laying Section 8-12
Backfilling for Cable 261 Arkona Becken
- Backfilling cable trench in shallow water area
Cover Crossing Point NSP 1 and 2 with Cable 261 Arkona Becken
- Cable 261 covered with concrete mattresses on Crossing points NSP1 and NSP2